Skip to content

People & Decisions

Who is connected to the next useful conversation

Documented roles and dated records for each account. Organizations and people have distinct roles; no single person is assumed to hold decision authority.

Larchwood, Iowa

Establish with Stockwell how the planned maintenance affects treatment requirements and whether the facilities study can consider a pretreatment option that reduces the load reaching the lagoon.

PolicySight’s approach

PolicySight’s recommended sequence, not an official approval chain.

  1. 1. Facilities study authorized by council

    September 14 minutes record approval of Stockwell’s lagoon facilities plan.

  2. 2. Remaining treatment need

    Confirm the alternatives under comparison and the ammonia need after planned maintenance.

  3. 3. Existing evidence mapped to Iowa

    Set Kingsville and Vancouver results against section 4.4.3 for engineer and DNR discussion.

  4. 4. Comparison by the engineer, if accepted

    A bounded comparison within the study, scoped with Stockwell.

Counterparts and organizations

  • Engineering partner

    Jon Brown, PE

    Principal Engineer and President, Stockwell Engineers

    Relevance: Presented the lagoon facilities plan proposal the council approved on September 14, 2026. His role in the study comes from the minutes; his title from the firm biography.

    Office telephone (Sioux Falls):
    605-338-6668
    General firm email:
    info@stockwellengineers.com

    Office and general firm contacts, not personal direct lines.

    Provenance: Larchwood council minutes, September 14, 2026 (section reviewed); Jon Brown, PE (page reviewed).

  • Project owner

    City of Larchwood

    Project owner; council authorized the facilities study

    Relevance: Owns the lagoon and will act on the plan’s options and costs. The meeting archive is where later lagoon decisions will appear.

    City Hall telephone:
    712-477-2366
    City Hall general email:
    info@cityoflarchwood.org

    Provenance: Larchwood agendas and minutes (archive listing reviewed); Larchwood council minutes, September 14, 2026 (section reviewed).

  • Reviewing agency

    Iowa Department of Natural Resources

    Reviewing agency for wastewater construction permits

    Relevance: Applies section 4.4.3 when a new process is proposed. Coordination runs through the owner and engineer.

    Provenance: Iowa Wastewater Facilities Design Standards, section 4.4.3 (section reviewed).

Chronology

Each date is labelled by type: meeting, event, document date, reproduction or registration close.

  1. June 18, 2025

    Document date

    Iowa Wastewater Facilities Design Standards

    Standards document date, not an AlgaFilm deadline.

  2. September 14, 2026

    Meeting date

    Council approves Stockwell’s lagoon facilities plan proposal; Public Works reports maintenance plans

  3. September 23, 2026

    Reproduction published

    Minutes reproduced by NoticeRegistry